waibainfratech.com

Facebook Twitter Digg 
0123
Competitive Advantage
  • Highly Experienced Team of Technocrats
  • Good Financial Position & TQM
  • Inhouse Design Facility
  • Capable of Executing EHV Projects
  • Provide Customized Solutions
  • Substantial amount of human and financial resources
  • Have good professional network

We have successfully completed Construction and Handover of 132/33/11 KV Syaule Substation as well as handover of 13 Nos. of 33/11 KV Substation under ADB funded Distribution System Augmentation and Expansion Project as well as recently achieved Break Through of Headrace Tunnel of Upper Dordi 'A' Hydroelectric Project (25MW). We have recently acquired turnkey projects of 132 KV Motipur, Sandhikharka and Nawalpur Substations.

Major contracts under execution

33/11 KV, 3 MVA substation at Lunkhu
Parbat district, Nepal

Excavator working at Riste, Ramechhap
  • Construction of 400 KV GIS Substation at Dhalkebar
  • Construction of Head Race Tunnel & Surge Shaft for Upper Dordi "A" Hydro Electric Project 25 MW
  • Construction of Test Adit Tunnel for Dudhkoshi Storage Hydro Electric Project - 300 MW
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of 132/33/11 kV, 30 MVA & 16 MVA Substation at Motipur and Sandhikharka
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of 132/33/11 kV, 30 MVA & 16 MVA Substation at Nawalpur
  • Distribution System Augmentation and Expansion Project - Distribution System Network Inprovement -Design, Supply and Install (14 Substations, Transmission Line and Distribution Network Construction and Upgradation work all over Nepal - ADB Funded)
  • Rural Electrification and Distribution Network Improvement of Tanahu District (2 Substations, Transmission Line and Distribution Network Construction and Upgradation work all over Nepal - ADB Funded)
  • Immediate Relief Measure Works (Supply, Delivery and Installation of Line Materials) at Nuwaakot and Rasuwa (KFW funded)
  • Design, Supply and Installation of Neighborhood Electrification works consisting of 33/11kV New Substations and associated 33kV, 11kV & 0.4kV Lines under Chilime-Trishuli 220 kV Transmission System Project (KFW funded)
  • Supply, Delivery, Installation, Testing and Commissioning and handover of 33/11 kV, 6/8 MVA Substation with Bay Extension At Sinam, Taplejung and 33kV Line from Amarpur Substation (Kabeli), Pachthar to Sinam, Taplejung
  • Design, Supply, Delivery. Installation/ Erection, Testing and Commissioning of 33/11kV, 6/8 MVA Substation at Taplejung
  • Supply, Delivery, Installation / Erection, Testing and Commissioning of 33kV Transmission Line from Bhedetar to Rajanrani
  • Supply, Delivery, Installation/Erection, Testing and Commissioning of 11/0.4-0.23 kV Electrical Distribution Network at the distribution areas of Phidim Upobhakta Sahakari Sanstha Limited., Panchthar
  • Supply, Delivery, Installation/ Erection, Testing and Commissioning of 11/0.4- 0.23 kV Electrical Distribution Network at the Distribution area of Thengenchowk Gramin Bidhyut Sahakari Sanstha Ltd., Manjabung 1, Pachthar
  • Supply, Delivery, Installation/Erection, Testing and Commissioning of 11/0.4- 0.23 kV Electrical Distribution Network at the Distribution area of Sarangdada Bidhyut Sahakari Sanstha Ltd.,Miklajong, Pachthar
  • Supply, Delivery, Installation/Erection, Testing and Commissioning of 11/0.4- 0.23 kV Electrical Distribution Network at the Distribution area of Nighuradhin Gramin Bidhyut Sahakari Sanstha Ltd., Nighuradhin, Taplejung
  • Supply, Delivery, Installation/Erection, Testing and Commissioning of 11/0.4- 0.23 kV Electrical Distribution Network at the Distribution area of Fulbari Gramin Bidhyut Sahakari Sanstha Ltd., Fulbari, Taplejung
  • Rehabilitation and Reinforcement of 6.3/33kV Switchyard of Panauti Hydropower Station and 33/11 KV Switchyard at Bhaktapur
  • Supply, Delivery, Installation, Testing, Commissioning and Handover of 11 kV line, distribution transformer and 0.4/0.23 kV within town plan area of Kohalpur Town Development Committee
  • Design, Supply, Delivery, Installation/ Erection, Testing and Commissioning of 33/11 KV, 3 MVA Substation at Bagedhunga, Lichki Ramche, Khotang
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of of 33/11 KV 3 MVA Substation at Musikot, Rukum
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of of 33/11 KV 3 MVA Substation at Matela, Surkhet
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of of 33/11 KV 6/8 MVA Substation at Koilachaur, Rolpa
  • Supply, Delivery, Installation, Testing and Commissioning, of 33 kV Line from Surkhet – Gangate - Matela - Jajarkot
  • Supply, Delivery, Installation, Testing and Commissioning of 11kV line from Ramghat - Bhotechaur, Ramghat - Chinchu, Ramghat - Kalayan
  • Supply, Delivery, Installation, Testing and Commissioning of 33kV line from Hapure-Tulsipur, Dang
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of Matatirtha Markhu 33 kV Sub Transmission Line
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of 33kV and 11kV Transmission Line Construction from Rakakopul, Baglung municipality to Harichaur Substation
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of Distribution Line Construction in Dubekol, Khotang Phase-2
  • Design, Supply, Installation, Construction, Testing, Commissioning and charging of Distribution Line Construction in Sapteshwar, Khotang
  • Upgradation of various 33/11kV Substations under Janakpur Regional Office
  • Project1
    Project 1
  • Project 2
    Project 2
  • Project 4
    Project 4
  • Project 5
    Project 5
  • Project 6
    Project 6
  • Project 7
    Project 7

© Copy Right 2011 by waibainfratech.com.